The Project Requirements

We received an online enquiry from a customer based in Old Stratford who wanted to get a couple of quotations to remove the existing back boiler and replace it with a modern combination system in the loft space upstairs.

What We Did

After the customer kindly agreed to progress with our quotation, we started the installation.

The entire heating system was drained down and the fire was removed. The existing back boiler was removed from the lounge and taken away from the building. The remaining copper pipework was cut and capped to ensure there was no gas leak during the works.
We then installed and new Ideal Logic+ 30kW combination boiler, flue and controls into the loft space upstairs. The new pipework was run to supply the new boiler in its new location.

Unfortunately, for the home owner, the new system needed a new gas supply. We installed a new 22mm pipe to supply the boiler from the gas meter.

To ensure that our boiler installation in Milton Keynes met the building regulations standard, we installed lighting and an access ladder to the loft for regular servicing and repair.

The customer will benefit from increased floor space in the airing cupboard and additional storage space through-out the house.

This boiler installation came complete with a 7-year warranty.

Customer Feedback

“Delighted with our boiler installation. Reis new exactly what he was doing and everything was done on time. Everyone was very polite and cleaned up after themselves, we now have a fantastic new boiler and load more storage space.”